• The Pittsburg & Midway Coal Mining Co.
  • The Pittsburg & Midway Coal Mining Co.
  • The Pittsburg & Midway Coal Mining Co.
  • The Pittsburg & Midway Coal Mining Co.
  • The Pittsburg & Midway Coal Mining Co.
  • The Pittsburg & Midway Coal Mining Co.
  • The Pittsburg & Midway Coal Mining Co.
  • The Pittsburg & Midway Coal Mining Co.

This project is three separate silos. Each is 54 foot diameter by 201 foot tall. J-Sons slipped the three silos simultaneously. Each silo contains a stainless steel-lined discharge hopper supported by wall pilasters and concrete ring beam. In addition to the silos, J-Sons’ scope of work included foundations and interconnecting roof with expansion joints.

Additional Information
Location:
Kemmerer, Wyoming
Purpose:
Coal Storage